Wireman · Transformers · 2023 NEC ·
Reference
Transformers
Full-load current, the biggest breaker or fuse allowed, and how the common connections work. For transformers 1000 V and less.
Full-load current formulas
Single-phase: I = kVA × 1000 ÷ V
Three-phase: I = kVA × 1000 ÷ (V × 1.732)
Common 480 to 208Y/120 V three-phase sizes
| kVA | Primary A (480 V) | Secondary A (208 V) |
|---|---|---|
| 15 | 18.0 | 41.6 |
| 30 | 36.1 | 83.3 |
| 45 | 54.1 | 124.9 |
| 75 | 90.2 | 208.2 |
| 112.5 | 135.3 | 312.3 |
| 150 | 180.4 | 416.4 |
| 225 | 270.6 | 624.5 |
Connections
Delta-wye (480 V delta to 208Y/120 V)
- Primary H1, H2, H3 to the 480 V phases. No neutral on the primary.
- Secondary X1, X2, X3 are the 208 V phases; X0 is the neutral (120 V to each phase).
- It's a separately derived system: bond X0 to ground at the transformer or the first disconnect, and run a GEC to an electrode (250.30).
- The secondary is shifted 30° from the primary. Two transformers feeding the same bus must match.
Single-phase 120/240 V
- Two 120 V secondary windings in series: X1 to X4 is 240 V, the middle tap (X2-X3 tied) is the neutral.
- Wired in parallel instead, the windings give 120 V only at double the current.
Buck-boost
- A small transformer wired as an autotransformer raises (boosts) or lowers (bucks) the voltage 5 to 20%, like 208 V to 230 V.
- Size it by the load kVA and the voltage change, using the maker's chart. It isn't a separately derived system.
- Protect it under 450.4 (autotransformers).
Checks before you energize
- Set the taps to match the measured supply voltage (each tap is usually 2.5%).
- Torque the lugs, confirm the X0 bond is in one place only, and check ventilation clearances on the nameplate (450.9).
- After energizing, measure every secondary phase-to-phase and phase-to-neutral voltage before landing loads.
NEC: 250.30, 450.4, 450.9, 450.14 (disconnecting means)