Parking lot or pole light out

One pole dark, a whole row out, cycling at night or burning all day. Control, base fuses, underground or the head.

Before you start

How much electrical experience do you have?

This sets how much detail each step shows. You can change it any time.

How it works

Site lighting usually runs at 208, 240, 277 or 480 V on underground circuits in conduit. A lighting contactor at the panel, switched by a photocell or a time clock, turns a whole group of poles on and off. Each pole base has a handhole with splices and often in-line fuse holders that protect that one head. The head has a lamp with a ballast and igniter (metal halide or high-pressure sodium), or an LED driver. Whether one pole or a whole circuit is out tells you whether to start at the panel or at the pole.